tabular format that can be exported to Microsoft Excel, XML or database format. Title: Short-Circuit Current Calculations (GET-3550F) Author: GE ED&C Subject: Application Keywords: GET-3550, GET-3550F, GET3550, GET3550F, Short circuit. Insulator strength should be more then the force exerted due to short circuit. For this PF the rms to peak ratio is 2.2 and hence 35000x2.2 77000.

Determine trip MVA for transmission lines.

Procure substation equipment rated to withstand continuous current. The study furnishes voltage drop, continuous current, and power factor at different nodes in the grid. This produces the correct short-circuit behavior. Four types of fault current calculations: Initial short-circuit current. Busbar short circuit calculation can be done according to IEC 60865. This results in a voltage drop at the receiving end of the line. The solution is to use nested IFs evaluation of IFs goes step-by-step from outer to inner, branching as necessary, and stopping when there is no further nested formula to be evaluated. Neither does OR-if the first argument in an OR expression is true, Excel will still try to evaluate the subsequent arguments.

I S E Z (1a) or I S 100 × I Zp+Zt (1b) I S E Z ( 1 a) o r I S 100 × I Z p + Z t ( 1 b) Conservatively, the impedance of the primary on a large utility substation or a network may be considered negligible (near zero) thus, a. What you're calling "early opt out" is more commonly called "short-circuit evaluation," and is generally a feature of languages in the C/C++/C#/Java family (but, notably, not Visual BASIC).įor Excel formulas, some logical functions practice short-circuit evaluation but some do not. In its simplified form, the short-circuit current can be conservatively calculated by the following equations.